The gate was opened around 11 am to release excess water into the Sukhna Choe, preventing overflow and potential flooding. Significantly, a trial run was conducted on June 28 to test the floodgates’ operational readiness.

The gate was opened around 11 am to release excess water into the Sukhna Choe, preventing overflow and potential flooding. Significantly, a trial run was conducted on June 28 to test the floodgates’ operational readiness.
Chatbot to help with booking groundwater survey, borewell site selection, openwell assessment, pricing, refund policy, and report downloads. Booking link: https://saharagroundwater.com/booking